Project: Construction of a New Warehouse Facility

Location: Orange County, NY
Soil volume: ~11,000 tons

SERVICES PROVIDED

  • Evaluated existing partial waste classification data for historic fill soil, and determined that there were zero exceedances thus far to the PA Clean Fill limits.

  • Provided technical guidance, and arranged the sampling and analysis for supplemental waste class to satisfy the testing requirements at a PA Clean Fill facility that was targeted as the most cost effective T&D option, given the geotechnical composition of the material, location, and other site-specific factors.

  • Coordinated the profiling process, obtained facility approval and State approval, and managed project scheduling, logistics, and manifesting of up to 60 loads per day.

  • This strategy had enabled the client to save more than one-hundred thousand dollars as compared with their initial plan to transport soils to a regional recycling facility.